Terrell Heights Storm Sewer Improvements Phase 1
The Project consists of storm sewer improvements within the Terrell Heights subdivision. These improvements include 500 feet of cured in place lining of 24-inch corrugated metal pipe, the removal of existing storm sewer and the installation of 95 feet 18-inch reinforced concrete pipe, 80 feet of 24-inch equivalent arch concrete pipe, 234 feet of 36-inch equivalent arch concrete pipe, storm junction boxes, hooded grated inlet, grate inlets, and concrete headwall. The project also includes the relocation of and 60 feet of an existing 6-inch water main and the installation of 60 feet of 8-inch sanitary sewer pipe and sanitary sewer doghouse manhole along with restoration of asphalt paving, curbing, and all other appurtenances and restoration of the project area.